Core drilling contractors face a relentless battle to maintain efficiency and profitability. While the direct cost of new equipment is easy to see, the true economic drain comes from on-site bottlenecks, safety risks, and the expensive need for rework. This is where the CorePro Extractor changes the game, transforming what was once a source of cost and frustration into a measurable financial advantage.


The Hidden Cost of Core Extraction

The core drilling process itself—from setup to the actual cut—is a time-consuming but necessary part of many construction and infrastructure projects. However, one often-overlooked area that erodes profitability is the final, crucial step: core extraction and handling.

Traditional extraction methods present several painful financial and operational challenges:

  • Rework and Material Waste: Damaged core samples during extraction frequently necessitate repeat drilling, incurring significant time, labor, and material expense. Crucially, damaged samples are often rejected by the lab, stopping the project flow.
  • Safety and Labor Costs: Workers are routinely exposed to the hazard of a concrete core slug “catching” or falling from the drilling bit and rig. This dangerous nature can require an additional operator to “catch” the core, eliminating man-hours that could be dedicated to other productive tasks.
  • Operator Strain: Current solutions can require excessive manual force for stubborn cores, leading to increased operator fatigue and reducing productivity over long shifts.

The CorePro Solution: Quantifiable Economic Impact

The CorePro Extractor directly targets and mitigates these issues, translating its technical advantages into quantifiable economic benefits for the contractor.

  • Eliminated Rework, Guaranteed Integrity: The CorePro’s innovative, adaptive gripping system, which anchors the all-thread into the core, provides a secure, non-damaging hold that surpasses current models. By minimizing chipping, cracking, or shattering, the extractor eliminates the need for repeat drilling and ensures immediate laboratory acceptance for testing. This saves significant time, labor, and material expenses on every project.
  • Increased Project Efficiency: The design of the new extractor incorporates optimized mechanisms that accelerate the core removal process without compromising integrity. If the CorePro reduces extraction time by a specific percentage per core, this directly translates to measurable labor cost savings over a typical project, appealing to the financial KPIs of decision-makers.
  • Massive Safety and Liability Reduction: By eliminating the need for an additional operator to “catch” the falling core slug, the CorePro prevents this high-impact risk at the jobsite. This unique selling proposition leads to fewer lost-time incidents, reduced workers’ compensation claims, and the elimination of potential client property damage. For a falling core slug incident, the workers’ compensation claim alone can range between $45,000 and $150,000, with property damage claims potentially escalating to over $1 million. The CorePro is not just a tool; it’s an insurance policy against catastrophic loss.

A Higher Value, Not Just a Higher Price

Procurement managers are explicitly tasked with securing “cost-effective” solutions. With the CorePro Extractor, the focus shifts from the initial purchase price to the Total Cost of Ownership (TCO).

A higher price point is justified because the CorePro demonstrably reduces variable costs—operator wages, potential rework, insurance premiums, and liability—which will far outweigh the initial investment over the tool’s long lifespan. The CorePro is an investment that pays for itself not only in efficiency but in risk mitigation, establishing itself as an indispensable asset for any cost-conscious and safety-focused core drilling company.

Back To Top

Leave a Reply

Your email address will not be published.*